September 21, 2023

亚瑟港液化天然气二期项目获得联邦能源监管委员会授权

Body

HOUSTON, Sept. 21, 2023 /PRNewswire/ -- Sempra Infrastructure, a subsidiary of Sempra (NYSE: SRE) (BMV: SRE), today announced that the Federal Energy Regulatory Commission (FERC) has approved the permit authorizing the Port Arthur LNG Phase 2 expansion project under development at Port Arthur LNG in Jefferson County, Texas. 该许可证是拟议的第二阶段项目的一个重要监管里程碑, including the addition of two liquefaction trains (trains 3 and 4) capable of producing up to 13 million tonnes per annum (Mtpa) of liquefied natural gas (LNG).

"Sempra Infrastructure is committed to investing in infrastructure opportunities that help enable a cleaner and more secure energy future," said Justin BirdSempra Infrastructure的首席执行官. “今天的FERC命令是太阳2平台推进全球能源转型能力的重要一步, 创造一个机会,使安全可靠的美国医疗服务的数量增加一倍.S. 阿瑟港液化天然气可以帮助向全球市场输送天然气."

目前一期工程正在建设中, the development of the proposed Phase 2 project could increase the total liquefaction capacity of the facility from approximately 13 Mtpa to approximately 26 Mtpa. The proposed project is also expected to include an additional LNG storage tank and marine berth and would benefit from some of the common facilities currently under construction that were previously approved as part of the Port Arthur LNG Phase 1 permitting process.

Sempra Infrastructure继续评估开发整个地区的机会 Port Arthur site while also exploring potential projects to reduce the carbon intensity of its LNG, positioning Port Arthur 作为能源转型的旗舰枢纽. The company is leveraging the integrated capabilities of its business segments to develop the proposed Port Arthur Pipeline Texas Connector project, the proposed Post Arthur Pipeline Louisiana Connector project and develop new gas storage facilities, 所有这些都将为亚瑟港液化天然气设施提供服务.

进一步推动亚瑟港能源枢纽的发展, 该公司最近收购了38家公司,000 acres of pore space and relevant surface rights to support the proposed Titan Carbon Sequestration project, 哪个位置离亚瑟港液化天然气设施最近. The project targets capturing carbon from Sempra Infrastructure's Port Arthur LNG Phase 1 and 2 projects that are currently under development and has the potential to unlock other net-zero energy infrastructure opportunities. This comprehensive development approach utilizes Sempra Infrastructure's broad development and operational expertise to enhance the total value of Port Arthur 并且可以为当地社区带来巨大的价值, 为本地区的经济增长机会开辟了大量的途径.

"The value proposition of the proposed Port Arthur Energy Hub goes beyond monetary investment in the region," said Bird. “Sempra Infrastructure提出的项目将创造新的, high-paying jobs, 增加在该地区的创新业务,并继续提升公司的声誉 State of Texas as a global energy leader."

亚瑟港液化天然气二期项目正在积极营销和开发中. 该项目可以帮助满足未来对美国天然气的需求.S. LNG供应预计将服务于欧洲, 亚洲和其他全球市场,因为各国都希望提高能源可靠性和安全性, 在电力生产中取代煤炭.

The Port Arthur LNG Phase 1 project is currently under construction and is designed to include two natural gas liquefaction trains, 两个液化天然气储罐和相关设施. 

Arthur港液化天然气二期项目的开发, 泰坦碳封存项目, 拟议中的亚瑟港管道路易斯安那州连接项目, proposed Port Arthur Texas Connector project and new gas storage facilities is contingent upon completing the required commercial agreements, 确保和/或维护所有必要的许可证, obtaining financing, 做出最后的投资决定, among other factors.

About Sempra Infrastructure

太阳2娱乐平台基础设施,总部设在 Houston, 专注于通过发展为更美好的世界提供能源, building and operating, and investing in clean power, energy networks, and LNG and net-zero solutions that are expected to play a crucial role in the energy systems of the future. 通过其资产的综合实力在 North America, Sempra Infrastructure is connecting customers across the globe to modern energy infrastructure to source and transport renewables and natural gas, 同时推进碳封存和清洁氢. 有关Sempra Infrastructure的更多信息,请访问 www.SempraInfrastructure.com and Twitter.

This press release contains statements that constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. 前瞻性陈述是基于对未来的假设, involve risks and uncertainties, and are not guarantees. Future results may differ materially from those expressed or implied in any forward-looking statement. These forward-looking statements represent our estimates and assumptions only as of the date of this press release. We assume no obligation to update or revise any forward-looking statement as a result of new information, future events or otherwise.

In this press release, 前瞻性陈述可以通过“相信”等词来识别," "expects," "intends," "anticipates," "contemplates," "plans," "estimates," "projects," "forecasts," "should," "could," "would," "will," "confident," "may," "can," "potential," "possible," "proposed," "in process," "construct," "develop," "opportunity," "initiative," "target," "outlook," "optimistic," "poised," "maintain," "continue," "progress," "advance," "goal," "aim," "commit," or similar expressions, or when we discuss our guidance, priorities, strategy, goals, vision, mission, opportunities, projections, intentions or expectations.

Factors, among others, that could cause actual results and events to differ materially from those expressed or implied in any forward-looking statement include risks and uncertainties relating to: decisions, investigations, inquiries, regulations, 拒绝或撤销许可证, consents, 批准或其他授权, and other actions by (i) the U.S. 美国能源部,Comisión Reguladora de Energía.S. 联邦能源管理委员会和其他政府和监管机构.S., Mexico and states, counties, cities and other jurisdictions therein and in other countries where we do business; the success of business development efforts, 建设项目、收购和资产剥离, 包括(1)能够作出最终投资决定的风险, (二)按期、按预算完成建设工程或者其他交易的, (iii)如果完成这些工作,实现任何这些工作的预期收益, and (iv) obtaining the consent or approval of third parties; litigation, arbitrations, 财产纠纷及其他诉讼, 以及法律法规的变化, 包括那些与能源行业有关的 Mexico; cybersecurity threats, 包括国家和国家资助的行为者, 勒索软件攻击太阳2平台的系统或与太阳2平台有业务往来的第三方的系统, 包括能源网或其他能源基础设施, 由于最近的地缘政治事件,所有这些都变得更加明显; 太阳2平台以优惠条件借钱并履行义务的能力, including due to (i) actions by credit rating agencies to downgrade our credit ratings or place those ratings on negative outlook or (ii) rising interest rates and inflation; failure of foreign governments, state-owned entities and our counterparties to honor their contracts and commitments; the impact on our ability to pass through higher costs to customers due to volatility in inflation, interest and foreign currency exchange rates and commodity prices; the impact of climate and sustainability policies, laws, rules, regulations, disclosures and trends, 包括采取行动减少或消除对天然气的依赖, 搁浅资产无法收回的风险, and our ability to incorporate new technologies; weather, natural disasters, pandemics, accidents, equipment failures, explosions, terrorism, 信息系统中断或其他影响太阳2平台运作的事件, 破坏太阳2平台的设施或系统, 造成有害物质的释放或火灾,或使太阳2平台承担损害赔偿责任, fines and penalties, some of which may not be recoverable through insurance or may impact our ability to obtain satisfactory levels of affordable insurance; the availability of natural gas, including disruptions caused by failures in the pipeline system of limitations on the withdrawal of natural gas from storage facilities; changes in tax and trade policies, laws and regulations, including tariffs, 修订国际贸易协定和制裁, 任何一项都可能增加太阳2平台的成本, reduce our competitiveness, 影响太阳2平台与某些交易对手开展业务的能力, or impair our ability to resolve trade disputes; and other uncertainties, 其中一些是难以预测的,超出了太阳2平台的控制范围.

These risks and uncertainties are further discussed in the reports that Sempra has filed with the U.S. 美国证券交易委员会(SEC). 这些报告可在证券交易委员会网站上通过EDGAR系统免费获得。 www.sec.gov, and on Sempra's website, 8cj.kanto-onsen.net.  投资者不应过分依赖任何前瞻性陈述.

Sempra Infrastructure和Sempra Infrastructure Partners与San Diego Gas不是同一家公司 & 电力公司或南加州天然气公司, 太阳2娱乐平台基础设施也没有, Sempra Infrastructure Partners nor any of its subsidiaries is regulated by the California Public Utilities Commission.

太阳2娱乐平台基础设施(prnewsphoto /太阳2娱乐平台基础设施)

 

 

SOURCE Sempra Infrastructure

Contact Info

Media Contact: Kym Butler, [email protected]财务联系人:Jenell McKay, (877)736 -7727; [email protected]